Energized Assets

A selection of industrial switchgears, microgrids, and megawatt battery installations successfully deployed.

Solar Array
RENEWABLE & STORAGE

Orion Logistics Park

Installed a 4MW rooftop solar array integrated with a 2MW BESS, allowing off-grid operation during peak utility hours.

Manufacturing Substation
HIGH VOLTAGE DISTRIBUTION

Vanguard Manufacturing Substation

Constructed a dedicated 69kV to 13.8kV step-down substation to power heavy assembly robotics and prevent local grid sag.

Factory Floor
INDUSTRIAL WIRING

SteelForge Foundry Upgrade

Re-wired a 150,000 sq ft casting facility with rigid Class I, Div 1 explosion-proof conduit and dedicated MCCs for blast furnaces.

IoT Dashboard
SMART GRID INTEGRATION

Centurion Data Center

Implemented an IoT-based load-shedding switchgear network capable of isolating critical server racks under 4 milliseconds.

Medical Campus
MICROGRID DEVELOPMENT

Apex Medical Campus

Engineered a self-sufficient microgrid combining dual gas turbines, rooftop solar, and redundant UPS systems for total islanding capabilities.

Switchgear
BATTERY STORAGE (BESS)

Port of Gainesville Logistics

Installed four 500kW containerized BESS units to smooth peak demands of massive overhead gantry cranes, saving $40k/month in penalties.

High Voltage Towers
HIGH VOLTAGE DISTRIBUTION

Triton Defense Systems

Extended a 138kV sub-transmission line 2 miles and erected a heavily fortified switchyard for a secure aerospace testing facility.

Wind Farm
RENEWABLE SOLUTIONS

Clearwater Agritech Hub

Integrated a series of commercial wind turbines with bidirectional net metering to offset power demands of massive indoor vertical farming operations.

Control Room
SMART GRID INTEGRATION

Omega Chemical Processing

Retrofitted a 1980s chemical plant with wireless SCADA nodes and intelligent switchgear, providing real-time thermal monitoring and phase diagnostics.

Server Wires
INDUSTRIAL WIRING

NexGen Biotech Labs

Delivered clean, isolated ground circuits and hospital-grade heavy wiring for an R&D facility heavily reliant on sensitive electron microscopes.

Construction Warehouse
BATTERY STORAGE (BESS)

Pinnacle Cold Storage

Commissioned a 1MW BESS system to guarantee uninterrupted refrigeration during rolling summer blackouts, safeguarding millions in perishable inventory.

Island Resort
MICROGRID DEVELOPMENT

Zephyr Island Resort

Built a totally independent power ecosystem for a luxury island resort, utilizing a custom solar-diesel-battery hybrid array managed by dynamic PLCs.